Sample Electrical Installation Line Items

Pre-loaded into the generator with realistic market pricing (LKR)

Customize in Generator →
Description Qty & Unit Est. Price (LKR) Line Total
12-Way Double Door Distribution Board (DB) with Surge Protector
Schneider / Hager 63A 30mA RCCB, 60A Main Double Pole Switch, Type 2 SPD, miniature circuit breakers (MCBs) 6A-32A.
1 set Rs. 78,500.00 Rs. 78,500.00
Light & Fan Point Wiring (Concealed PVC Conduit)
ACL / Kelani 1.0mm² copper single-core cables, Orange/Clipsal modular switches, heavy-duty 20mm PVC conduit, junction boxes.
45 point Rs. 2,850.00 Rs. 128,250.00
13A / 15A Universal Power Outlet Point Wiring
Kelani / ACL 2.5mm² + 1.5mm² Earth wire, Orange Electric switched sockets, concealed metal back-boxes.
26 point Rs. 3,650.00 Rs. 94,900.00
Dedicated 20A AC & Water Heater Heavy Point Wiring
ACL 4.0mm² twin & earth cable, double pole 20A neon switch, direct connection to designated breaker in DB.
6 point Rs. 6,800.00 Rs. 40,800.00
Copper Earth Rod & Lightning Grounding System
5/8 inch 10ft pure copper clad earth rod, earthing clamp, 16mm² copper earth cable, earth inspection test pit chamber.
1 set Rs. 38,000.00 Rs. 35,000.00
CEB Earth Resistance Testing, Certification & Form Signing
Megger test, earth electrode resistance verification (< 10 ohms), and statutory electrician certification for electricity meter connection.
1 service Rs. 22,000.00 Rs. 22,000.00
Sample Subtotal: Rs. 399,450.00

Default Commercial Terms

  • Light fittings, chandeliers, exhaust fans, and AC machines to be supplied by client unless specifically itemized.
  • Wall chasing and cutting in reinforced concrete columns/beams is subject to structural engineer approval.
  • Rates include standard 1-year workmanship warranty on all wiring points.

Warranty & Payment Milestones

Warranty Coverage:
10-Year manufacturer warranty on ACL/Kelani cables. 1-Year replacement warranty on DB switchgear and circuit breakers. 1-Year installation workmanship guarantee.
Payment Schedule:
50% advance for conduit and wire procurement, 35% upon completion of cable drawing and DB fitting, 15% upon testing and CEB certification.
Timeline:
Rough-in conduit piping: 5 working days. Cable drawing and DB termination: 4 working days after wall plastering.

Ready to create this quotation?

Load these items into our generator, customize your business info, logo, customer details, and download a professional A4 PDF.

Use This Electrical Installation Template Now

Frequently Asked Questions

How are points calculated in Sri Lankan electrical quotations?

Points are billed per fixture location (light point, 13A socket point, 20A AC point). This includes the cable length, conduit piping, mounting box, and switch plate.

Does this quote cover CEB testing?

Yes, our template includes an item for CEB earth resistance testing and chartered electrician signature.

Related Quotation Templates